Navy Ford (CVN-78) Class Aircraft Carrier Program: Background and Issues for Congress
Ronald O'Rourke
Specialist in Naval Affairs
CVN-78, CVN-79, and CVN-80 are the first three ships in the Navy’s new Gerald R. Ford (CVN- 78) class of nuclear-powered aircraft carriers (CVNs).
CVN-78 was procured in FY2008 and was funded with congressionally authorized four-year incremental funding in FY2008-FY2011. The Navy’s proposed FY2012 budget estimates the ship’s procurement cost at $11,531.0 million (i.e., about $11.5 billion) in then-year dollars. The Navy’s proposed FY2011 budget requested $1,731.3 million in procurement funding as the final increment to complete this estimated procurement cost; the FY2011 Department of Defense and Full-Year Continuing Appropriations Act (H.R. 1473/P.L. 112-10 of April 15, 2011) reduced this request by $9.3 million.
CVN-79 is scheduled for procurement in FY2013, and has received advance procurement funding since FY2007. The Navy’s proposed FY2012 budget estimates the ship’s procurement cost at $10,253.0 million (i.e., about $10.3 billion) in then-year dollars and requests $554.8 million in advance procurement funding for the ship.
On July 11, 2011, it was reported that the Navy, as a potential measure for reducing near-term funding requirements, is considering the option of deferring the scheduled procurement of CVN- 79 by two years, to FY2015. This option, if implemented, might substantially reduce FY2013 and FY2014 funding requirements for CVN-79. It could also increase the total procurement costs of CVN-79 and certain Virginia-class attack submarines, and have implications for the aircraft carrier industrial base and future aircraft carrier force levels.
CVN-80 is scheduled for procurement in FY2018, with advance procurement funding scheduled to begin in FY2014. The Navy’s proposed FY2012 budget estimates the ship’s procurement cost at $13,494.9 million (i.e., about $13.5 billion) in then-year dollars.
Oversight issues for Congress for the CVN-78 program include the potential for cost growth and technical and design issues that were raised in a December 2010 report from the Department of Defense (DOD) Director of Operational Test and Evaluation (DOT&E).
Date of Report: July 11, 2011
Number of Pages: 29
Order Number: RS20643
Price: $29.95
Follow us on TWITTER at http://www.twitter.com/alertsPHP or #CRSreports
Document available via e-mail as a pdf file or in paper form.
To order, e-mail Penny Hill Press or call us at 301-253-0881. Provide a Visa, MasterCard, American Express, or Discover card number, expiration date, and name on the card. Indicate whether you want e-mail or postal delivery. Phone orders are preferred and receive priority processing.